The big reconstruction continues2002-2003
To be continued!
Some paited details
Painted brakebells.
A smaching diff!
Rearaxel and propellershaft. All rust is gone frome the frame
Afer 40 years there must be some damages
This framedamage made me nervous tough.
Another angel.
The cross sheet vas rusty so i made a new.
The crossmember I have to fix in place.
I have to cut out a piece of the frame and welld a new piece in place.
The jobīs done. Iīm satisfied
Newpainted frame!
Doorstep from outside. The blueish ting is the airdryer for the brakes
The mounting has begun.
Brakebells, airpipes and cablage in place
The level valves for the airsuspension
Brakebells again.
Mounting the airsuspention bellows.
More cables and pipes in place
LPG pipes drawn.
Batterycabels drawn to the mainswitch.
The battery box
Stars looking complete.
Studie of the Thelmabrake, An effective rachcal.
The battery box and the stainless exhaust pipe.
Batterier på plats i sitt lilla hus.
Nice and cleen overside 
Some of the floor beams in place.
Soon a new fridge.
An the kitchen area.
More painting.
Think if I could cut down the weelhousings!
Ready for insulation and floorpanels.
Doorstep again.
Along the wall vas a canal that collects condense water. Tectyl and plastic foam fixed the job
40 year old groundpaint is stuck.
A nightmare! The roof line have rusted off!
Even the alu. is worn.
The inner ceilingpanels is down as the insulation
The cutout in the roof
The rusty out cut.
The cut out from the inside.
A new piece is wellded in place.
The same from the outside.
And some paint again.
Cables to taillights and so on goes along the ceiling
viewe along the left side.
New welld on the right side to.
All original wellding was untreated from the beginning
More paint! It makes miracles.
Oh! What a brightness
First the wite color....
....Then with the black then you canīt miss anyting
An old Sptite caravan on the outside.
Styrofoam as insulation. Yes i know it sucks water but it takes 20 years.
How cares!
Time for wallpanels!
The date on the camera is wrong so you know!.
panels and insulation in ceiling in place
Witepainted masonite in the ceiling.
Overcabinette for the bedroom.
Toilett, shower and store room
The same from the bedroom
You need a lot of wardrobes
Furnich at rear end.
Testing the new fridge.
Doors to wardrobes mounted
The fridge again.
Testing the new Tethford WC2000 .
The shower and toilett gots a little cryptic
Electics, water, gas and heatingpipe under the kitchenbench.
Alde heater and some pluming in wardrobe.
Holes for the Alde gas heater
Radiator mounting in store.
Have i mention the word paint?.
The Polar furnishing from -89 still hangs on.
OOh, that brightness again!!
240V heater with circulationpump mounted.
.
Freehanging manouverpanel. The newest
As the time runs out i have to put in the old kitchen again.
No i didnīt bought that with the panel
The spotlights looks nice.
Or what?
Soon we can move in.
The wardrobs from the bedroom
At last a new big fridge with freezer
Takett floor ready.
All oak trim in place.
On the wardrobewall you can see the temostate for the Alde heater.
Hmmm. Think im satisfied with the results..
In with the beds and start up the engine!!